Skip to main content Skip to main content

Engineering and Survey Projects Across West Texas

County facilities, city waterlines, and residential subdivisions across Midland and West Texas, delivered with surveying, engineering, and testing under one roof. Here is how the work went.

$175M+
In public facilities tested
264
Acres surveyed and designed
12,200
Feet of waterline alignment mapped
290+
Residential lots platted
Filter

Recent Projects

Each project page covers the work, the challenge, how Magrym approached it, and what the client walked away with. Filter by service line or browse them all.

The Nest Subdivision Land Development
Civil EngineeringConstruction Services

The Nest Subdivision

Midland County, TX| 2025 to present

Civil design for utilities, roads, grading, and drainage, plus construction management and coordinated testing and staking through build-out.

View Project
Midland County Detention Facility Municipal
Construction Services

Midland County Detention Facility

Greenwood, Midland County, TX| 2024 to 2026

Soils, concrete, and masonry testing plus on-site inspection for the county facility that replaces the aging Midland jail complex.

View Project
Midland County Justice of the Peace Annex Municipal
Construction Services

Midland County Justice of the Peace Annex

300 N. Main Street, Midland, TX| 2025 to 2026

Soils, concrete, and masonry testing for the 29,000 square foot courthouse annex that consolidates county departments downtown.

View Project
Josiah Addition Section 2 Land Development
Land Surveying

Josiah Addition Section 2

Midland County, TX| Platted

Boundary and topographic survey plus county plat and variance application for 200 plus one-to-two acre lots along East County Road 150.

View Project
Pony Express Subdivision Land Development
Civil EngineeringLand Surveying

Pony Express Subdivision

Midland County, TX| 2025 to 2026

Boundary and topographic survey, plat, site and roadway design, drainage, utility coordination, and highway access permitting for 90 plus lots on 97 acres.

View Project
Todd Road Waterline Survey and SUE Municipal
Land Surveying

Todd Road Waterline Survey and SUE

Midland, TX| 2025

Drone and GPS topo plus hydrovac Quality Level A utility locates along a 12,200 foot waterline alignment from Loop 250 to Todd Drive.

View Project

No projects match that filter yet. Choose another service line or view all projects.

The Same Team From Kickoff to Closeout

These projects differ in size and scope, but they were delivered the same way: a project manager you can reach, disciplines that coordinate under one roof, and documentation that stays traceable after the job is done.

Direct Access

You reach the project manager running your work, not a call center. Questions get answered directly by the person doing the work.

Integrated Scope

Survey, engineering, and testing coordinate from one Midland office, so handoffs happen across a hallway instead of across firms.

Traceable Documentation

Test reports, plats, and utility data organized and traceable, whether the reviewer is a county judge or a lender.

Have a Project Like One of These?

Talk to a project manager about scope, schedule, and a quote.