Skip to main content Skip to main content

SPCC Plan Preparation and Certification in Midland, TX

Facilities that store, use, process, or transfer oil may be subject to the federal Spill Prevention, Control, and Countermeasure rule based on facility type, aggregate storage capacity, and potential discharge pathways. Magrym evaluates potential applicability and prepares facility-specific SPCC Plans for tank batteries, fuel-storage facilities, and other oil-handling operations across Midland and the Permian Basin.

SPCC Plans for Oil-Handling Facilities

The federal Spill Prevention, Control, and Countermeasure rule may apply to non-transportation-related facilities that store, use, process, or transfer oil. Applicability depends on aggregate storage capacity, the types of containers present, regulatory exclusions, and whether the facility could reasonably discharge oil to navigable waters or adjoining shorelines.

Magrym evaluates potential applicability and prepares facility-specific SPCC Plans for tank batteries, fuel-storage facilities, and other oil-handling operations. Services may include site evaluation, container inventories, facility diagrams, secondary-containment calculations, inspection and recordkeeping procedures, discharge-response measures, and supporting documentation.

Our engineers also assist with periodic plan reviews and amendments when facility conditions or operations change. Professional Engineer review and certification are provided when required or requested; eligible qualified facilities may use the self-certification provisions available under the rule.

Magrym engineers reviewing facility drawings during SPCC plan development in Midland, Texas

SPCC Services From Plan Development Through Implementation

Support for applicability evaluation, plan preparation, certification, facility documentation, secondary-containment review, training, inspections, and plan updates.

SPCC Plan Development

Magrym prepares facility-specific SPCC Plans based on site conditions, oil-storage activities, container inventories, potential discharge pathways, secondary containment, and operating procedures. Each engagement begins with a facility evaluation, not a generic template.

  • Facility evaluation and site visit
  • Facility-specific SPCC Plan preparation
  • Tank-battery and fuel-storage plans

Professional Engineer Certification

SPCC Plans that do not qualify for self-certification generally require review and certification by a licensed Professional Engineer. Magrym evaluates self-certification eligibility and provides PE review and certification when required or requested.

  • Self-certification eligibility review
  • Professional Engineer review and certification
  • Certification of applicable technical amendments

Plan Reviews and Amendments

SPCC Plans should reflect current facility conditions and operations. Magrym supports the required five-year review process, evaluates operational and equipment changes, and prepares technical amendments when applicable.

  • Five-year plan reviews
  • Facility-change evaluations
  • Technical plan amendments

Secondary Containment Review

Magrym evaluates secondary-containment systems against applicable capacity, freeboard, drainage, and facility-specific requirements. Reviews may include containment calculations, berm and dike conditions, displacement, penetrations, and potential discharge pathways.

  • Containment-capacity calculations
  • Dike and berm evaluation
  • Drainage and freeboard review
  • Corrective-action recommendations

Facility Diagrams and Inventories

Magrym prepares facility diagrams and oil-storage inventories that document containers, transfer areas, secondary containment, drainage features, and other information required for the SPCC Plan.

  • Site and containment diagrams
  • Container and oil-storage inventories
  • Survey-supported facility mapping, when required

Training and Inspection Programs

Magrym helps facilities establish documented training, inspection, and recordkeeping procedures consistent with the SPCC Plan and applicable requirements. Services can include program development, checklists, schedules, forms, and implementation support. Facilities can pair routine inspections with environmental monitoring.

  • Personnel-training program support
  • Inspection checklists and logs
  • Inspection and testing schedules
  • Recordkeeping procedures

Who We Prepare SPCC Plans For

SPCC applicability depends on the type of facility, oil-handling activities, aggregate storage capacity, regulatory exclusions, and potential discharge pathways. Magrym helps owners and operators evaluate applicability and develop facility-specific plans when required.

Oil and Gas Operators

Magrym prepares and updates SPCC Plans for applicable oil and gas operations, including tank batteries, production facilities, and fixed operating locations. Plans document oil storage, transfer activities, secondary containment, inspection procedures, and discharge-response measures.

Midstream and Bulk Storage

Terminals, tank-truck home bases, bulk-storage facilities, and transfer areas may include both transportation-related and non-transportation-related components. Magrym evaluates potential SPCC applicability and documents regulated containers, transfer activities, drainage, and secondary containment.

Commercial and Industrial Facilities

Generators, fuel tanks, hydraulic systems, maintenance activities, and other equipment may contribute to a facility’s regulated oil-storage capacity. Magrym evaluates containers, capacities, activities, and applicable exclusions before determining whether an SPCC Plan may be required.

Farms and Ranches

Farms and ranches may be subject to SPCC requirements based on their oil-storage activities, capacity, discharge potential, and applicable agricultural provisions. Magrym evaluates facility conditions and self-certification eligibility and prepares or updates SPCC Plans when required.

Engineers Familiar With Your Facility

An effective SPCC Plan should reflect the facility’s actual oil storage, transfer activities, drainage, secondary containment, inspection procedures, and operating conditions. Magrym combines on-site facility evaluation with engineering review to prepare plans based on documented conditions and applicable requirements. Clients have direct access to the professional responsible for their project.

  • Professional Engineers on staff
  • On-site facility evaluation
  • Permian Basin oil-storage experience
  • You talk directly to the engineer on your plan
Licensed Texas PE
PE certification when required
Midland, TX Based
Permian Basin every week

From Site Walk to Certified Plan

A clear path, run by the same engineer, built around what an inspector reviews.

01

Facility Review

We walk the facility, inventory the containers, and total the oil storage capacity against the regulatory thresholds. Fixed fee proposal up front, applicability answered honestly.

02

Plan Development

We write the plan to the EPA rule with the diagrams, spill response procedures, and countermeasures that fit how the facility operates.

03

Certification and Delivery

When PE certification is required, our licensed Professional Engineer certifies the plan. We deliver it with training and inspection records set up.

the inspector, with training and inspection records set up.

04

Keep It Current

We handle the five-year reviews and prepare amendments when the facility changes, so the plan on file matches the site.

Frequently Asked Questions

An SPCC plan is a written Spill Prevention, Control, and Countermeasure plan that describes how a facility stores and handles oil, the secondary containment in place, and the steps personnel take to prevent and respond to a discharge. It is required under the federal SPCC rule for facilities that meet the applicability thresholds, and it must be kept on site and followed in practice.

A facility needs one when it stores oil above the applicable threshold and a discharge could reasonably reach navigable waters or adjoining shorelines. Oil is defined broadly and includes crude, condensate, diesel, gasoline, lubricating and hydraulic oil, and animal and vegetable oils. The SPCC plan requirements apply to the combined capacity of qualifying containers across the site rather than to any single tank, which is why facilities with several small tanks are caught more often than owners expect. Magrym assesses applicability before you commit to a plan.

It depends on the facility size and its discharge history. Smaller facilities that meet the qualified facility criteria may self-certify. Larger facilities, and any plan that relies on environmental equivalence or an impracticability determination, require certification by a licensed Professional Engineer. We review eligibility first and tell you which path applies before any work starts, because a self-certified plan for a facility that does not qualify is not a valid plan.

The rule requires a review at least once every five years, and a technical amendment whenever a change at the facility materially affects the potential for a discharge. Adding a tank, changing the containment, relocating equipment, or altering transfer operations all trigger an amendment. Amendments generally carry the same certification requirement the original plan carried, and they belong in the file promptly rather than at the next five-year review.

Yes. Production facilities are covered, and tank batteries holding crude or condensate are a common SPCC focus in the Permian Basin. The rule does contain provisions written specifically for production, but the requirement itself is not waived. If a lease stores oil above the threshold and a discharge could reach a watercourse, it needs a plan.

Yes. We support SPCC compliance alongside stormwater permitting, environmental permitting, facility surveying, and civil design out of the same Midland office. For an operator building or expanding a facility, that means the diagrams, the containment, and the compliance documents are produced by one firm and stay consistent with each other.

Need an SPCC Plan in the Permian Basin?

Get an SPCC plan written from a site walk and certified by a licensed Texas Professional Engineer when required. Call (432) 684-5548 to request a fixed fee proposal.


Call us +14326845548