The Nest Subdivision
Civil engineering design and construction management for the roads, grading, drainage, and water system of a new residential subdivision in Midland County.
Designed by Magrym, Built Under Magrym’s Oversight
The Nest is a residential subdivision in Midland County where Magrym Consulting provides civil engineering design for the overall development, including utilities, roadways, grading, and drainage, and construction management for the civil infrastructure as it is built.
Our construction management scope includes coordination and field oversight for mass grading, roadway construction, drainage improvements, and installation of the water distribution system. Magrym also coordinates the materials testing and surveying services that verify the work against the approved plans and project specifications.
Services delivered on this project:

Keeping Design, Construction, and Verification in One Sequence
Subdivision infrastructure is built in a strict order. Mass grading sets the pads and the drainage, roads follow the grading, and the water system goes in with the streets. When the engineer, the construction manager, the surveyor, and the testing lab are four different firms, the sequence slips at every handoff.
The developer needed one party accountable for the plans, the field decisions, and the verification that the built work matched the design, with new homes already standing along the edge of the site.

How Magrym Runs the Job
The engineer who designed the infrastructure is the one managing its construction.
Civil design
Utility, roadway, grading, and drainage design for the overall development, sealed by our Texas PE.
Contractor coordination
Project meetings, contractor coordination, and schedule and issue tracking through civil and utility construction.
Field oversight
Construction observation of mass grading, roadway construction, drainage improvements, and water distribution installation.
Testing and survey coordination
Materials testing and construction staking coordinated for quality assurance, layout, and conformance with the approved plans.
Infrastructure Moving in Order, With One Firm Accountable
Mass grading is complete, street corridors are cut and based, and the water distribution system is going in with the roads. Each phase has been observed, staked, and tested by the same team that designed it.
The developer works with one point of contact for design questions, field decisions, and quality assurance, which is the model Magrym brings to every land development project in the Permian Basin.
Construction Progress
Aerial photos as the site moved from raw land through mass grading to street construction.
Sep 9, 2025
Feb 10, 2026
Aug 20, 2026More Projects
Municipal Midland County Detention Facility
Soils, concrete, and masonry testing plus on-site inspection for the county facility that replaces the aging Midland jail complex.
View Project
Municipal Midland County Justice of the Peace Annex
Soils, concrete, and masonry testing for the 29,000 square foot courthouse annex that consolidates county departments downtown.